The 1960s-era lagoon is too small to serve the airport during the peak travel season and does not have the capacity to serve in the future.ĭuring the summer of 2019, the airport had to spread approximately 74,100 gallons of sewage on the northern end of the property. "What might delay some of this is the actual construction of the lift station, which could take upwards of a year," Dame said. The lift station will then send the wastewater through another 12,200 feet of four-inch pipe west along the highway, where it would connect to the city's existing sewer infrastructure. "That's already probably right around a quarter mile left to dig along there and then they will start digging in the opposite direction to the treatment plant," he said.Ī new lift station will be installed near the intersection of Airport Road and State Highway 79. It includes 4,820 feet of eight-inch piping that will travel along Airport Road to a new lift station.ĭame said the new pipe has been installed all the way to the lagoon area and the construction team has a bit more to install along Airport Road. The estimated $2.5 million project will build a new gravity sewer line from the airport's main collection system to carry wastewater to the city's Water Reclamation Facility. Right now they're digging along Airport Road," Airport Executive Director Patrick Dame said Tuesday. "We're starting to see some of these things come to fruition as we're able. 13-Construction has started on Rapid City Regional Airport's new sanitary sewer collection system that will eventually replace the outdated lagoon system that caused environmental concerns in the past.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |